Everyone who has ever opened a venue says the same thing: it cost more and took longer than expected. Usually not because the kitchen disappointed, but because the order of the decisions was wrong.
This article sets out the steps in the order that works in practice, with the cost items most often forgotten. It does not replace your accountant, but it prevents the most expensive mistakes.
Start with your concept and your numbers
Before you visit a property, you need to know what you are selling and to whom. How many covers do you want to run, at what average spend, on which days? Work that up into a monthly turnover and set your expected costs beside it. That exercise takes an afternoon and determines everything that follows: the size of your room, your staffing needs and the rent you can carry. How to calculate it is in our article on break-even per service.
Permits and formalities
The classic sequence: business registration, a tax number, affiliation with a social insurance fund, and a bank account. On top come hospitality-specific items: registration or approval with the food safety authority, liability insurance for fire and explosion, possibly a licence to serve alcohol and a terrace permit from your municipality. Do not forget your music rights and your obligations around a registered cash register. Start early, because lead times are long.
The costs that catch people out
Budget for more than the fit-out alone. The big items are kitchen equipment, refrigeration, furniture, extraction, electrics and plumbing. On top come the deposit and first months of rent, till and software, plates and glassware, workwear, a first stock, and your architect or contractor. And then the item most often missing: a buffer to bridge the first six months. A dining room does not fill up in week one, while your fixed costs run from day one.
Choosing the location
Look beyond footfall. Check the permitted use of the property, the possibility of extraction, the connections, delivery access and whether a terrace is allowed. Read your lease carefully: term, break options, indexation and who pays for which works. A cheap property with an expensive conversion is more expensive than an expensive property that is ready. Add a year of rent to the conversion cost before you compare.
Staff from day one
Decide on your permanent core before you open and work alongside it with a flexible layer for the peaks. The rules around that are in our article on flexi-jobs and student workers. Allow a real induction period: menu, allergens, till and booking system. A team improvising in week one builds habits you then have to unlearn. Record hours worked from the start with time tracking.
Systems in place before you open
Three things must work on your first day: your till, your bookings and your website. Put your booking widget live before you open, so guests can already book during your announcement. Make your Google Business Profile complete with photos, hours and a booking button to your own system. And write your reservation policy before the first guest calls, not after the first no-show.
The opening itself
Do not open at full capacity straight away. Start with limited time slots and a smaller menu, so your kitchen and floor can find their rhythm. Invite neighbours and suppliers first for a soft opening; that gets you your first reviews without the risk of a full house. Collect guest details from day one and ask for feedback after the visit. Those first fifty reviews determine your visibility for the rest of the year.
Conclusion
Opening a restaurant is mostly a matter of order: first your numbers, then your permits, then your property, then your team and your systems, and only then your doors. Budget a buffer for six months, put your bookings and your Google profile live before opening, and start calmly with limited capacity. Always have the formalities checked with your accountant and your municipality, because they differ per region.